Friday, November 20, 2026Fri, Nov 20 Updated

Mexico City, Mexico and the world. News in English.

Electric RTP Buses Cut Topilejo Waits to 15 Minutes on New Route

Mexico City launched La Ruta del Maíz electric buses in Topilejo, Tlalpan, on Nov. 15. Buses now pass every 10 to 15 minutes and the fare is 4 pesos.

Bright green trolleybus captured moving swiftly through Sarajevo, Bosnia and Herzegovina.
Photo: Sandin Redzo / Pexels

Residents of San Miguel Topilejo, a hillside pueblo in the Tlalpan borough, now have electric buses passing every 10 to 15 minutes. Before, the wait could reach an hour and a half, according to the city bus operator Red de Transporte de Pasajeros (RTP, Mexico City’s public bus network).

Mayor Clara Brugada flagged off the service, called La Ruta del Maíz (the Corn Route), on Nov. 15. It runs from San Miguel Topilejo to La Joya, a Metrobús station, and adds buses to four routes that already served the area.

What it means for riders in Topilejo

RTP director Daniel Arcos Rodríguez said the new service runs from 4:30 in the morning until midnight, El Universal and Quadratín CDMX reported. Reports differ on the last departure: elmomento.mx put it at 11 at night. That outlet also described the earlier frequency as one bus per hour, now one every 15 minutes.

The fare is 4 pesos, paid with the Movilidad Integrada card (the city’s rechargeable transit card), according to elmomento.mx. The buses are 10.8 meters long and have boarding access for people with reduced mobility.

Brugada described the vehicles as “safe, comfortable and with low fares.” She said people who live farthest from the center spend the most time and money getting to work or school, and called the route a matter of territorial justice.

Which routes get more buses

Besides the Topilejo to La Joya run, Arcos Rodríguez said the new units strengthen route 34B and its branches:

  • Topilejo to Estadio Azteca
  • Topilejo to Metro Universidad
  • San Miguel Ajusco to Xochimilco

Brugada also named the connection to Ciudad Universitaria (CU, the main UNAM campus) among the routes being reinforced. Residents asked for more buses on every line, and the Metro Universidad branch will get the largest addition, elmomento.mx reported.

The mayor ordered an oversight commission to monitor the timetable. Its members will come from the community, RTP, the Tlalpan borough government and the city’s local Casa de Gobierno office.

Where the money comes from

Brugada said her administration is spending 2 billion pesos to buy close to 400 electric buses for RTP. Each one costs nearly twice as much as a conventional unit, she said, and the city accepts that price to run vehicles that do not pollute.

The money comes from a trust fund fed by the Licencia Permanente program, the permanent driver’s license the city sells. Brugada called the program a success and said its revenue is paying for the switch to electric transport.

Repaving starts in December

At the same event, Brugada announced a second round of repaving that gives priority to roads in and between the pueblos originarios (the city’s native towns). Work begins in the first week of December.

Works Secretary Raúl Basulto Luviano said crews will resurface 21 roads that connect 27 pueblos and 55 colonias, about 93 kilometers in all, in Magdalena Contreras, Tlalpan, Xochimilco, Milpa Alta and Tláhuac. Brugada’s own list of boroughs also included Cuajimalpa.

In Tlalpan the program covers about 26 kilometers, Quadratín CDMX reported. The roads include Circuito Ajusco, the Picacho-Ajusco highway and its connection to Periférico, and the corridors that link San Miguel Topilejo with the federal highway to Cuernavaca and with communities in Xochimilco. Drivers who use those roads will meet paving crews from early December.

More changes under study

City officials described the bus launch as the first stage of a mobility plan for Topilejo. Mobility Secretary Héctor Ulises García Nieto said his office is studying new connections and changes to road layout with federal authorities, and will present them for evaluation. He gave no dates.

Tlalpan Mayor Gabriela Osorio Hernández said San Miguel Topilejo had not seen a transport project of this size since 2008.

Sources: El Universal, Quadratín CDMX, elmomento.mx